CITY QUAYS 3

Case Studies / CITY QUAYS 3

Main contractor

Farrans Construction

Date of Construction

January 2020

Engineers / Architects

RPP Architects
THE CHALLENGE

SDG were approached by Tyrone Formwork to assist with the supply of a permanent formwork solution.
Floor slabs are usually 300mm however this job had a requirement of a 1650mm deep slab.

Contact was made with SDG to see if we could source a solution to pour without using traditional formwork methods to facilitate a quicker basement slab pour.

OUR SOLUTION

SDG sourced recostal® 2000 GT which is permanent formwork allowing Tyrone Formwork to create a construction joint on the slab with a key profile according to Euro Code 2.

Units are supplied to specific project-heights on site. Recostal® shuttering is also available with anti-leakage material and clamps to eliminate the need to weld rebars.

THE RESULTS

Benefits include:

  • Self-supporting, systemised method of construction joint support
  • Vastly reduced labour for fixing and removing traditional methods
  • Bespoke to dimensions onsite
  • Stronger joint profile allows reduced rebar
  • Accommodates slabs up to 3000mm