Case Studies / Lesley Park Royal - Belfast

Download PDF

SDG alongside supply partner Isomass worked with contractor P & K McKaigue on Lesley Park Royal

  • Main Contractor- P & K MCKAIGUE
  • Project- Lesley Hill Royal
  • Date of construction – August 2019
  • Product(s) Supplied- Isocheck Screedcheck XL9
Project Summary

Destined to be one of Belfast’s most prestigious developments.

Lesley Park Royal will bring a range of Luxury apartments, semis, and detached houses to East Belfast.

The Challenge

SDG alongside supply partner Isomass worked with contractor P & K McKaigue to propose the use of the Isocheck XL9 Screedcheck Impact Improvement System.

Isomass calculated the exact build-up required to meet the relevant sound transmission standard.

Our Solution

Isocheck Screedcheck XL impact improvement systems are designed specifically for placement within a structural floor build up, directly below the screed.

This acoustic layer isolates the screed from the structural sub-floor and provides enough impact absorption to place it amongst the top performing low density acoustic systems.

The Results

The Isocheck Screedcheck XL9 features a 9mm closed cell non-cross-linked foam layer.

When installed correctly Screedcheck XL9 will enable compliance with Approved Document E.

Share this case study
More Case Studies

On the BT ThermoPin, Taranto’s Design Manager commented: – “The BT ThermoPin was a simple for choice us. We can use less per SQM than market alternatives, meaning less material and subsequently less overall cost to our programme. The assistance with design for us is imperative, it frees us up to concentrate on other aspects of production whilst giving us assurances that our designs are more than sufficient. We are very happy with the innovative solutions that SDG continue to provide us with consistently”

SDG working with Todd Architects designed and supplied a unique jointing system of acoustic ceilings expertly installed by Castle Ceilings.

SDG are the supply partner of Bekaert Murfor Compact, which was used to reinforce the external masonry. Used by MG Construction Murfor Compact offered a fast, simple and economical way of reinforcing masonry walls.

SDG working alongside Doran Consulting from design stage right through to advising the construction team on site reference installation best practice for bridge bearings at this Belfast project.

LIV Student Accommodation with over 11 floors of Shearail® used to increase the shear resistance of a slab, and safety transfers the shear load from the slab to the column.

At SDG our knowledge of the impact of the correct acoustics in different environments grows it is no surprise that the education sector is one area where you can’t afford to be complacent.

Through the use of the BT turnbuckle on these LIDL store projects it has been possible to reduce the temporary bracing, increase safety and shorten the assembly time for the precast wall elements , it ticks all our the boxes. We are excited to implement it in our future projects.

SDG have always gone above and beyond for us. With SDG’s technical support our team have the ability to use the most effective and innovative solutions to improve quality, save time and perform more effectively.

I spoke to Ciaran Donnelly and after a few subsequent drawings emailed back and forth we agreed on the detail. SDG had the assembly on site within 3 days and saved us a lot of time on site with cutting and welding. We were able to lower the assembly into place in one piece with no concerns. I would most definitely engage in this service again.

Ready to know how we can support your business?